Construction
Hyundai E&C wins $725 mn Saudi Arabia HVDC line order
The power line will be able to transmit a greater amount of electricity than the conventional HVDC system
By Nov 12, 2024 (Gmt+09:00)
1
Min read
Most Read
LG Chem to sell water filter business to Glenwood PE for $692 million


Mirae Asset to be named Korea Post’s core real estate fund operator


KT&G eyes overseas M&A after rejecting activist fund's offer


StockX in merger talks with Naver’s online reseller Kream


Meritz backs half of ex-manager’s $210 mn hedge fund



Hyundai Engineering & Construction Co. (Hyundai E&C) said on Tuesday it has bagged a $725 million order to build a power transmission line in Saudi Arabia, marking its largest-ever power distribution line contract secured from the Kingdom.
It is part of a construction project for a 1,089 kilometer-long, 500 kilovolt (kV) high-voltage direct current (HVDC) transmission line. It will connect Kudmi Substation, southwest of Saudi Arabia, to Riyadh Combined Cycle Power Plant 14 in its capital city.
Under the contract Hyundai E&C signed with National Grid SA, a power transmission unit of Saudi Electricity Co, it is responsible for Portion 1 of the three-portion project to build a 369-km transmission line near Kudmi Substation by January 2027 on a turnkey basis, it said in a statement.
For the construction, it will introduce the double bipole HVDC system with a power transmission capacity of 4,000 megawatts to the Kingdom.

An HVDC transmission system is regarded as a next-generation electricity transmission technology, ideal for renewable energy such as solar and wind power.
It uses a direct current for electricity transmission, with voltages between 100 kV and 800 kV.
It is also called a power superhighway because it can transport significantly more power over greater distances than the common high-voltage alternative current (AC) line and incurs fewer power losses.
The South Korean builder has completed a total of 35 transmission line projects in Saudi Arabia over the past 50 years.
Write to Eun-Ji Shim at summit@hankyung.com
Yeonhee Kim edited this article.
More to Read
-
Construction & PlanningHyundai E&C signs engineering deal for two nuclear reactors in Bulgaria
Nov 05, 2024 (Gmt+09:00)
2 Min read -
Business & PoliticsHyundai E&C, South Australia sign renewable energy, infrastructure deal
Oct 22, 2024 (Gmt+09:00)
2 Min read -
Hydrogen economyHyundai E&C to build Korea's 1st electrolysis-based hydrogen plant
May 30, 2024 (Gmt+09:00)
2 Min read -
EnergyHyundai E&C expands foreign alliances in pursuit of UK SMR project
Mar 06, 2024 (Gmt+09:00)
3 Min read -
ConstructionHyundai E&C bags $145 mn order to build HVDC line in Saudi Arabia
Aug 01, 2023 (Gmt+09:00)
3 Min read
Comment 0
LOG IN